Difference between revisions of "Characterization, Assessment & Monitoring"
m (1 revision imported) |
|||
Line 9: | Line 9: | ||
*[[Geophysical Methods | Geophysical Methods]] | *[[Geophysical Methods | Geophysical Methods]] | ||
**[[Geophysical Methods - Case Studies]] | **[[Geophysical Methods - Case Studies]] | ||
+ | *[[Groundwater Sampling - No-Purge/Passive]] | ||
<br /> | <br /> | ||
<br /> | <br /> | ||
|style="width:50%; vertical-align:top; "| | |style="width:50%; vertical-align:top; "| | ||
+ | |||
*[[Overview of Long-Term Monitoring (LTM)|Long-Term Monitoring (LTM)]] | *[[Overview of Long-Term Monitoring (LTM)|Long-Term Monitoring (LTM)]] | ||
**[[Long-Term Monitoring (LTM) - Data Analysis]] | **[[Long-Term Monitoring (LTM) - Data Analysis]] | ||
Line 20: | Line 22: | ||
**[[Quantitative Polymerase Chain Reaction (qPCR)]] | **[[Quantitative Polymerase Chain Reaction (qPCR)]] | ||
**[[Stable Isotope Probing (SIP)]] | **[[Stable Isotope Probing (SIP)]] | ||
− | |||
|} | |} | ||
==Additional Documents== | ==Additional Documents== | ||
*[http://www.itrcweb.org/DNAPL-ISC_tools-selection/ Integrated DNAPL Site Characterization and Tools Selection] | *[http://www.itrcweb.org/DNAPL-ISC_tools-selection/ Integrated DNAPL Site Characterization and Tools Selection] |
Revision as of 14:58, 4 May 2018
Site characterization, assessment & monitoring is a major component of contaminant site management. Topics covered include long-term monitoring (LTM), traditional and emerging technologies for assessing the rate and extent of contaminant degradation, spatial and temporal distribution of contaminants, and formation properties that influence contaminant migration.
Related Articles
|